Data Analyst: Adan Qaisar
Client/Sponsor: Comsats University
Purpose:
Write a brief description of why this
project is happening below. Why is this project happening? What are the goals?
|
The
project is referred as Final year project of Computer Engineering students. ADAS: Few
are listed below: · Reduction
in Infrastructure Spending ·
Energy Conservation
· Increase
in productivity · Self-driving
applications and uses in other industries · Public transportation · Less
collisions · Emergency
control systems |
Scope / Major Project Activities:
What are the major parts
of this project? List out the high-level steps, activities, or stages of the
project, and give a brief description for each.
|
Activity |
Description |
|
No Automation |
The automated system has no control over the vehicle, but may
prompt the driver of hazard. |
|
Driver Assistance |
The driver and the automated system share control of the
vehicle. Examples of this can be found in most cars equipped with ADAS |
|
Partial Automation |
The automated system is capable of taking full control of the
vehicle; however, the driver must be ready to intervene if the system fails
to recognize a potential hazard |
|
Conditional Automation |
The Automated system takes full control of the vehicle and the
passenger can safely take their attention away from driving tasks; however,
they must still be able to intervene |
|
High/Full Automation |
The driver can safely divert all attention away from driving tasks
and let the automated system take full control. This functionality is
currently limited to specific “geofenced” areas and other relatively
controlled environments, |
Thisproject does not include:
Specify
the things that this project isn’t responsible for doing (out of scope). For
instance, “this project does not involve a summation of 2019 data analysis”
● n/a
● n/a
Deliverables:
A specific list of things that your project will
deliver.
|
Deliverable |
Description/ Details |
|
Requirements, specifications
and architecture design |
Designing the
architecture and collecting all requirements and outcome specifications |
![]()
Page 1 of 2
Data Analysis Project
![]()
|
Development, integration |
Development the
components and software, compelling/ integrating the software and design |
|
Large scale (Big data set)
Verification |
Converting data
into training data and testing data with 70% , 30% of the total data
respectively |
|
Evaluation |
Evaluating the
data trained model |
|
Coordination and Communication |
Communicating
with industries and firms |
Schedule
Overview / Major Milestones:
The expected schedule for the project. This can be
defined by milestones (e.g. “all data is cleaned and processed”), periods of
time (“Week 1 / Week 2”), or other ways based on the needs of the project.
|
Milestone |
Expected Completion Date |
Description/Details |
|
Phase 1: TBD |
TDB |
TDB |
|
Phase 2: TDB |
TDB |
TDB |
|
Phase 3: TDB |
TDB |
TDB |
*Estimated
date for completion:
Without working apart from our engineering,
it can’t be done.